Ijraset Journal For Research in Applied Science and Engineering Technology
Authors: Santosh Kumar, Ramesh B, Nagesh S, Panduranga B, Hariprasad G
DOI Link: https://doi.org/10.22214/ijraset.2022.43697
Certificate: View Certificate
Hot Mix Technology is used from many years in the construction of bituminous layer. It basically involves heating of aggregates and bitumen, mixing and laying of the mixture at a high temperature around 120°C - 165°C. Though it is well suited for all the types of roads because of its good performance, it has several dis-advantages such as degradation of environment, it consumes lot of energy, problems due to hardening of asphalt, and it cannot be laid in cold region and during rainfall season. There is an increasing demand for the Cold Mix Asphalt (CMA) due to its several advantages and also it is gaining importance nowadays specially in the cold areas. The main advantage is the elimination of heating of aggregates and bitumen; instead emulsion can be used in producing the bituminous mix. Also, Cold Mix Asphalt is eco-friendly and consumes less energy. In the present study, the main objective is to check the feasibility of cold mix asphalt for Bituminous Concrete layer. For Cold Mix Asphalt bitumen emulsion of grade SS-2 is used. The Marshall Test is carried out on CMA and Hot Mix Asphalt (HMA) by varying bitumen emulsion and bitumen content respectively.. The results obtained are comparable with Hot Mix Asphalt. Hence Cold Mix Asphalt is feasible for BC layer.
I. INRODUCTION
In India, the main utilization of bitumen emulsion was found in the 1970s. The whole world utilized 12 million tons of emulsion mid-seventies, India devoured just 20,000 tons till 1996, out of the aggregate bitumen utilization of around 2 million tons. After 2005 there has been an unfaltering ascent in the utilization and request of bitumen emulsions. At exhibit, for all intents and purposes all the street development and upkeep necessities can be met with the utilization of bitumen emulsion. Prudent choice and fitting utilization of these innovations can yield huge economies, natural advantages and vitality security to the extent development and upkeep of streets are concerned. Many field trials and research work led from Central Road Research Establishment (CRRI) and other oil organizations on cold mix blend advances under various movements furthermore, climatic conditions have been observed to be empowering.
Cold mix is produced at ambient temperature (23°C to 25°C). It can be prepared in concrete or in the cold mix plant. In northern part of India, it has many weather restrictions. Also in hilly areas and in the areas where there is always heavy rainfall. In the states like Jammu and Kashmir, Assam, Manipur, Meghalaya and Arunachal Pradesh it very difficult to adopt hot mix technology. In such places cold mix technology can be used. Cold mix is beneficial in the construction of rural roads and also in case of high altitudes because hot mix requires heating of mixture at high temperature. Also in case of construction of rural roads it is difficult to maintain the temperature if the construction site is distance is greater. Simple concrete mixers can be used to produce cold mix and they can be even laid by small scale jobs. Due to all these reasons cold mix is gaining importance. Cold mix is beneficial in the construction of rural roads and also in case of high altitudes because hot mix requires heating of mixture at high temperature. Also in case of construction of rural roads it is difficult to maintain the temperature if the construction site is distance is greater. Simple concrete mixers can be used to produce cold mix and they can be even laid by small scale jobs. Due to all these reasons cold mix is gaining importance. In cold mix technology, emulsion and pre-wetting water content is added to aggregates. It’s mixing, its production and its laying everything is done at ambient temperature i.e. 23°C to 25°C. Also it can be produced and laid in hot mix asphalt plant due to its similar techniques. It is also friendly technique for the labours.
II. SCOPE AND OBJECTIVES OF THE STUDY
The aim of the present work is to study the Experimental Evaluation on the Performance of Cold Mix Asphalt in comparison with Hot Mix Asphalt and check the feasibility of cold mix for BC layer. Following are some of the objectives of the present work.
A. Laboratory evaluation of aggregates and bitumen emulsion for determination of physical and mechanical properties.
B. To arrive at the mix design of Cold mix asphalt (IRC: SP: 100) and Hot mix asphalt (MoRTH).
C. To test the behavior of Cold Mix Asphalt and Hot Mix Asphalt through Marshall Test.
D. To check the feasibility of Cold Mix Asphalt for BC layer.
III. MATERIALS USED IN THIS STUDY
Aggregates used in this study were procured from a quarry Bidadi road Bengaluru. Physical properties of aggregates were tested as per specified test procedure. Aggregates were graded as per the gradation requirement for BC grade 1 according to MoRTH (2013). Aggregates of size 20mm, 12mm, 6mm, dust and filler materials were used. Final mix proportion obtained is 24%, 25%, 24%, 25% and 2% of 20mm down, 12mm down, 6mm down, dust and filler respectively. In the present study cement of the grade OPC-43 was used as filler material. Bitumen of grade VG-30 was used in the present study for the preparation of hot mix asphalt. Bitumen VG-30 was procured from Civil Aid. Bitumen emulsion of the grade SS-2 cationic type was used for the preparation of cold mix asphalt. Emulsion was procured from HINCOL Company. Test on emulsion was carried out in accordance with IS: 8887. Properties of aggregates, bitumen VG-30 and bitumen emulsion is shown in the table 1, 2 and 3 respectively.
IV. MIX DESIGN
Marshall Test is conducted to find out optimum bitumen emulsion content and optimum bitumen content. The mix design procedure for cold mix and hot mix is explained below.
A. Cold Mix Design
The design procedure is followed as mentioned in IRC: SP-100. Following steps are followed for the preparation of cold mix specimens.
For the calculation of Initial Bitumen emulsion following equation 1 is used. Purpose of calculating initial bitumen emulsion is to find out optimum pre-wetting water content.
P = 0.05A+0.1B+0.5C Eq (1)
P= the quantity of bitumen emulsion (%)
A= the percent of Aggregate retained on the 2.36mm sieve.
B= the percent of aggregate passing through 2.36mm sieve and retained on the 90-micron sieve.
C= Percent Aggregate passing through the 90-micron sieve.
2. Determination of Optimum Pre-Wetting Water content
The Initial bitumen emulsion content calculated from equation 1 is kept constant and water content is varied from 2% to 4% with difference of 1%. Specimens are prepared with the water content 2%, 3% and 4% and calculated initial bitumen emulsion content. Densities of all the specimens are checked. The specimen which gives maximum density that water content is chosen. This per-wetting water content is kept constant for the calculation of optimum bitumen emulsion content.
3. Variation of Bitumen Emulsion content
Around 1200 gm of graded aggregates are taken and are mixed with optimum pre-wetting water content for about 1-2 minutes. Emulsion content are varied from 6% to 10%. For each % of bitumen emulsion three trial specimens are prepared. After mixing with optimum pre-wetting water content bitumen emulsion is added and is mixed thoroughly so that all the aggregates are coated with emulsion. The mixture is left for drying under fan for 2 hours and in oven at 40°C for further 2 hours. After drying the mixture is transferred to Marshall mould and is compacted with 50 blows on both the sides. After compacting the specimen is left in the mould for 24 hours. Next day the specimen is extruded from the mould. After demoulding the specimen is kept for 3 days for curing, 24 hours in oven at 40°C and last 48 hours it is cured in air at room temperature. After curing specimens are subjected for testing in Marshall Apparatus to determine the bulk density, stability and flow value of dry specimens and wet specimens. For dry stability, specimens after curing is directly subjected to testing. For wet stability specimens before testing are conditioned under vacuum pressure for one hour and are subsequently immersed in water for further one hour at room temperature.
Below table 4 shows the Marshall Test results of dry specimens. From the Marshall results graphs are plotted between Stability Vs Bitumen emulsion, Flow Vs Bitumen emulsion, Density Vs Bitumen emulsion, Air voids Vs Bitumen emulsion and VFB Vs Bitumen emulsion to find out the Optimum Emulsion content.
Figure 1, figure 2, figure 3 and figure 4 shows the graphical representation between the Stability Vs Bitumen emulsion, Flow Vs Bitumen emulsion, Density Vs. Bitumen emulsion and Air voids Vs Bitumen emulsion respectively. From all the graph optimum emulsion is chosen 8%.
Stability Vs Bitumen emulsion, Flow Vs Bitumen emulsion, Density Vs Bitumen emulsion, Air voids Vs Bitumen emulsion and VFB Vs Bitumen emulsion to find out Optimum Emulsion content.Figure 5, figure 6, figure 7 and figure 8 shows the graphical representation between the Stability Vs Bitum enemulsion, Flow Vs Bitumen emulsion, Density Vs. Bitumen emulsion and Air voids Vs Bitumen emulsion respectively. From all the graph optimum emulsion is 8%
B. Hot Mix Design
The design procedure is followed as mentioned in MoRTH (2013). Following steps are followed for the preparation of hot mix specimens. 1200 gm of graded aggregates are taken and heated at 175°C, bitumen content is varied from 5%, 5.5%, 6%, 6.5% and 7%. Moulds are preheated at 95 °C to 100°C temperature. After heating the aggregates bitumen is added and is mixed with aggregate. Mixing is continued till the temperature reaches to 160°C. After mixing, the mixture is transferred to Marshall mould and is tamped 75 times on both sides. The specimen is left in mould for 24 hours and is extruded from the mould the next day. Specimens after de- moulding are subjected to Marshall testing. Before testing specimens are kept in water bath at 60°C for 45 minutes. Bulk density, stability and flow value are found out. Graphs are plotted and optimum bitumen content is found out from graphs. Test results are tabulated in the table 6 below. From the Marshall results graphs are plotted between Stability Vs Bitumen content, Flow Vs Bitumen content, Density Vs Bitumen content, Air voids Vs Bitumen content and VFB Vs Bitumen content to find out Optimum Bitumen content. Figure 09, figure 10, figure 11, and figure 12 shows the graphical representation between the Stability Vs Bitumen content, Flow Vs Bitumen content, Density Vs. Bitumen content and Air voids Vs Bitumen content respectively.
V. RESULTS AND DISCUSSION
Tests were conducted on both CMA and HMA. The results of the tests conducted on both are compared below. Fig. 13 shows the comparison of stability values between CMA and HMA. The stability of CMA is found greater than the stability of HMA. Fig. 14 shows the comparison of flow values between CMA and HMA. The deformation of HMA is more in comparison with CMA. Fig. 15 indicates the comparison between CMA and HMA. Form the figure it is seen that the density of cold mix asphalt is less than the density of hot mix asphalt. Fig. 16 shows the comparison of Air Voids between CMA and HMA. Air voids of HMA are more than CMA. The range of air voids according to MoRTH specifications is 3- 5%; cold mix asphalt is within the specified range.
The study was conducted on the experimental evaluation on the performance of CMA and HMA. Various tests were conducted and conclusions are drawn. It was seen that cold mix asphalt has met all the requirements that are required for bituminous concrete layer. Following are the some of the conclusions drawn from this experimental study. A. Physical properties of Aggregates, bitumen emulsion and bitumen used in this experimental study were within the specifications mentioned. B. Material gradation obtained has met the specifications given by MORTH clause table 500-17. C. Results of Marshall Stability of cold mix asphalt were found 34.09% greater than hot mix asphalt. D. Flow value of cold mix asphalt was found within the specified range. Deformation of cold mix asphalt was found 13.87% less than hot mix asphalt. E. Density of cold mix asphalt was found 3.12% less than hot mix asphalt. F. For 8% optimum emulsion content the air voids obtained is between 3-5%. Hence cold mix has met the air voids requirement given by the MORTH specifications.
[1] Rajan choudhary, Abhijit Mondal and Harshad S Kaulgud, Use of Cold Mixes for Rural Road Construction, Indian Institute of Technology , 2012. [2] M S Randadive and Anup Kumawat, Quality Control of Cationic Emulsion Modified Cold Mix in Flexible Pavement, ISSN 0974-5904, Volume 09, No. 03, June 2016. [3] Narake Virabhadra, Sumilkumar, Ukrande Amol, Nimse Annasaheb, Narlawar Ajinkya, Prof. D N Deshpande, Comparison of Hot Mix Asphalt and Cold Mix Asphalt, International Engineering Research Journal (IERJ) Volume 2, Issue 3, Page 1366-1268, 2016, ISSN 2395- 1621, 25th May 2016. [4] Siksha Swaroopa, Sravani A and P K Jain, Comparison of mechanistic characteristics of cold, mild warm and half warm mixes for bituminous road construction, Indian Journal of Engineering and Material Sciences, Vol. 22, pp. 85-92, 26 August 2014. [5] I. N. A. Thanaya Beng, PhD, S. E. Zoorob MEng, PhD and J. P. Forth BEng, PhD, MASCE, A laboratory study on cold-mix, cold-lay emulsion mixtures, Institute of Civil Engineers, pp. 47-55, ISSN 1751- 7710, February 2009. [6] Normunds rancans, Experience of use of cold mix in the republic of Lativa, Volume 1, Issue Number: 2, Publisher: Vilnius Gediminas Technical University, ISSN: 1822-427. [7] Amir Kavussi and Leila Hashemain, The effect of lime and cement in Foam bitumen mixes. [8] IRC: SP: 100 USE OF Cold Mix Technology in construction and maintenance of roads using bitumen emulsion. Published by INDIAN ROADS CONGRESS. Kama Koti Marg, Sector-6, R.K. Puram, New Delhi. [9] MORT&H, specifications for Roads and Bridges 5th revision, Indian Road Congress, New Delhi. [10] IS 1202 (1978), “Indian standard methods for testing tar and bituminous materials (First Revision)”, Bureau of Indian Standards, New Delhi. [11] S K Khanna, C E G Justo and Veeraragavan, “Highway Material Testing Laboratory Manual”, Nemchand and Brothers, Roorkee, 2010. [12] ASTM, “Standard Test Method for Indirect Tensile (IDT) Strength of Bituminous Mixtures”, D 6931 – 07, American Society of Testing and Materials. [13] Bureau of Indian Standards. Bitumen emulsion for roads (cationic type)- Specification (Second Revision). IS 8887:2004, March, 2004. [14] Indian Standards, “Tests on Aggregates?, IS: 2386 – 1986, Indian Road Congress, New Delhi.
Copyright © 2022 Santosh Kumar, Ramesh B, Nagesh S, Panduranga B, Hariprasad G. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Paper Id : IJRASET43697
Publish Date : 2022-06-01
ISSN : 2321-9653
Publisher Name : IJRASET
DOI Link : Click Here