The field of Architecture, Engineering, and Construction (AEC) plays a vital role in driving global progress. Yet, the need for innovative ideas has presented the AEC sector with its fair share of hurdles. Introducing Building Information Modeling (BIM), a rapidly expanding tool on the global stage, aimed at boosting AEC efficiency and resolving key challenges. Recent times have witnessed both public and private sectors making BIM integration a requirement in new construction projects. However, the utilization of BIM by governments, particularly in less developed nations, remains limited. This research brings together industry stakeholders to discuss the merits of BIM, identify obstacles, and suggest practical solutions, thus encouraging wider adoption and reaping the benefits of BIM.
I. INTRODUCTION
Architecture, Engineering, and Construction (AEC) have been increasingly embracing Building Information Modeling (BIM). In the industry, it has become a big deal like a high-tech tool. BIM has a bunch of roles in AEC, like making 3D models look real, catching issues, checking if things work, calculating amounts needed, and guessing costs. Plus, it's all about 4D schedules, green analysis, making drawings, and managing buildings. With BIM being used throughout a project, it's like a superhero team – making things less risky, stopping mistakes, helping everyone cooperate, and sharing knowledge between designers, engineers, and builders, making sure everything's accurate and reliable.
The AEC business is like the heart of development for lots of countries (Elhendawi et al., 2019), having a big say in how a country grows (Giang & Pheng, 2011). But there's been a bunch of issues in this sector over time, from clients not getting what they want to projects taking too long, costing too much, and not being top-notch (Ahmed et al., 2018). Inside AEC, Azhar et al. (2015) show that there's not enough work getting done, efficiency's down, performance is meh, keeping things eco-friendly is a struggle, the environment isn't protected well, working conditions aren't great, and safety isn't well-managed. With technology getting more complicated, data managing getting trickier, supply chain stuff changing a lot, and how deals are made switching up (Ahmed et al., 2018), people want smart and green buildings. BIM has come to the rescue as a way to improve communication and teamwork in AEC (Gerges, M. et al., 2017; Matarneh & Hamed, 2017). BIM actually started back in the '70s, but it really hit the AEC scene in the 2000s. Since then, lots of different industries and governments have seen how useful BIM is and started using it (Eastman et al., 2011).
II. BENEFITS OF BUILDING INFORMATION MODELLING (BIM)
Just like tech is helping out everywhere, BIM is like the tech sidekick for AEC. BIM can do lots of cool stuff, depending on whether you're new to this or already a pro (McGraw-Hill, 2009). Here's what we've learned from lots of reading – check out Table 1 to see the big benefits of using BIM.
Table 1: Benefits of Building Information Modeling (BIM)
Sl. No |
Authors |
Benefits of BIM |
Participants |
|||||
C* |
A/E* |
C/SC* |
D* |
OP* |
FM* |
|||
1 |
(Sabol, 2008; Omar, 2015)
|
Management of the building (during planning and construction) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
2 |
(Karna, et al.,2009)
|
Increase client and consumer happiness. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
3 |
(McCartney, 2010)
|
Designers are learning more about construction processes. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
4 |
(Liu, et al.,2010)
|
Increased accuracy
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
5 |
(Liu, et al., 2010 : construction, M.H, 2012)
|
Claims and legal cases have been reduced. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
6 |
(Azhar, et al., 2011 : Abbasnejad & Moud, 2013) |
Reduced requests for information (RFIs) (improves project comprehension and eliminates uncertainty)
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
7 |
(Azhar, 2011; Chan, 2014)
|
Innovative and creative solutions |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
8 |
(Eastman, et al., 2011)
|
Overcoming geographical distances and bridging capacity gaps with international AEC professionals
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
9 |
(Eastman, et al., 2011; Samuelson & Bjork, 2013)
|
Increase the capacity of designers and the competition
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
10 |
(Eastman, et al., 2011: Sebastian, 2011)
|
adherence to specifications, norms, and codes
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
11 |
(Elbeltagi & Dawood, 2011: Bryde, et al., 2013)
|
Encourage prefabrication for higher quality |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
12 |
(Construction, M.H, 2012)
|
Maintain repeat customers, Market new products and services (such as reality capture) and increase profitability.
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
13 |
(Construction, M.H, 2012; Chan, 2014)
|
Human Resources should be distributed more evenly. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
14 |
(Latiffi, et al., 2013 : Chan, 2014 : Gerges, et al., 2016; Matarneh & Hamed, 2017) |
Assistance with construction and project management (strategic planning, site planning, risk management, communication, executive, change plans, added value, greater safety, and improved facility management) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
15 |
(Moreno, et al.,2013) |
Promote safety plans to reduce accidents. |
Yes |
No |
Yes |
No |
Yes |
No |
16 |
(Eadie, et al., 2013 : Doumbouya, et al., 2016) |
Increase the accuracy of building sustainability analyses.
|
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
17 |
(Wang, et al., 2014; Omar, 2015) |
Interactive architectural visualization using augmented reality |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
18 |
(Love, et al., 2014 : Volk, et al., 2014)
|
As-built plans (for existing properties, laser scanning) |
Yes |
Yes |
Yes |
No |
Yes |
Yes |
19 |
(Jernigan, 2014) |
Integrating new team members quickly and easily |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
20 |
(Chan, 2014; Gerges, et al., 2016) |
Procurement on time (decrease inventory length and order materials just in time) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
21 |
(National Building Specification, 2014; Azhar, et al., 2015) |
Improve competitiveness (advance the firm's competitive advantages) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
22 |
(Elmualim & Glider, 2014) |
Value for money should be promoted. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
23 |
(Jernigan, 2014) |
Maintain participant satisfaction by keeping them informed. Reduce your hazards. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
24 |
(Jernigan, 2014; Omar, 2015) |
Client interaction begins early. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
25 |
(Harrison & Thurnell, 2014; Love, et al., 2014) |
Based on verified data, make quick and correct decisions. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
26 |
(Chan, 2014; Doumbouya, et al., 2016; Matarneh & Hamed, 2017)
|
Time saving (reduces the time spent on project documentation, communication, and analysing several possibilities in a short period of time) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
27 |
(Sales, 2015) |
Improve site logistics plans |
Yes |
No |
Yes |
Yes |
Yes |
Yes |
28 |
(Azhar, et al., 2015) |
Assembly that is automated |
Yes |
No |
Yes |
Yes |
Yes |
Yes |
29 |
(Omar & Dulaimi, 2015) |
Reduce waste (waste removal and value creation) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
30 |
(Baik et al., 2015) |
GIS with BIM integration |
Yes |
Yes |
Yes |
No |
Yes |
No |
31 |
(Doumbouya, et al., 2016; Matarneh & Hamed, 2017) |
Improve efficiency (quicker and more efficient processes and approaches) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
32 |
(Almutiri, 2016) |
Design that is free of flaws. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
33 |
(Doumbouya, et al., 2016; Matarneh & Hamed, 2017) |
Cost savings (lower overall project costs, design and construction expenses, and communication costs) |
Yes |
Yes |
Yes |
No |
Yes |
No |
34 |
(Gerges, M, et al., 2017) |
Improving quality (less rework and better design), ensuring data availability throughout the project life cycle |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
35 |
(Matarneh & Hamed, 2017; Gerges, M, et al., 2017)
|
Clash detection (checking for design nonconformities at the pre-building stage, resolving conflicts between disciplines prior to construction) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
36 |
(Gerges, M, et al., 2017: Shaban & Elhendawi, 2018)
|
Improve visualization (simulation, building representation in an integrated data environment, elimination of design misinterpretation risk) |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
37 |
(Matarneh & Hamed, 2017: Ahmed, et al., 2018)
|
Improve collaboration and communication among all parties |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
38 |
(Matarneh & Hamed, 2017)
|
Maintaining control throughout the project's life cycle and increasing productivity |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
39 |
(Matarneh & Hamed, 2017)
|
Change orders should be reduced greatly |
Yes |
Yes |
Yes |
Yes |
Yes |
No |
40 |
(Zewein, 2017; Khalil, 2017) |
Improve the value engineering and lean construction principles. |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
41 |
(Elhendawi, et al., 2019)
|
Budget and expense estimation have been improved. |
Yes |
Yes |
Yes |
No |
Yes |
No |
C-Customer
A/E-Architect/Engineer
C/SC-Contractor/Subcontractor
S-Supplier
D-Dealer
Op-Other participants
Salla (2014) listed the top fifteen benefits of employing BIM in the following order: (1) reduce mistakes and omissions in the design process, (2) improve collaboration with owner/design firms throughout the building phase, (3) improve organizational image, and (4) improve organizational performance. (4) Minimize rework. (5) Reduce construction costs, (6) Improve cost control and predictability, (7) Shorten project length, (8) Market new business, (9) Provide new services, (10) Increase profits (11) Maintain business viability. (12) Shorten workflow cycle times. (13) Shorter client approval periods; (14) Increased safety; and (15) Shorter regulatory approval cycles.
III. BARRIERS OF USING BIM (BUILDING INFORMATION MODELING)
As outlined by Azhar et al., (2015), organizations in developing countries are facing lots of challenges when it comes to adopting BIM, even though it has obvious benefits. Adopting BIM is like solving a hard puzzle. Eadie et al. (2014) point out that BIM challenges vary according to whether you already use them. According to Panuwatwanich et al., some of the main problems with BIM are:
Big Challenges Highlighted by (2013) and Omar (2015): According to (2013) and Omar (2015), there are two major roadblocks that stand out: first, there's not enough dedication from management to actually put BIM to use, and second, there's a serious lack of know-how when it comes to switching to BIM and dealing with the problems that come with it.
Now, let's look at what McGraw-Hill (2012) discovered – the top difficulties in using BIM are things like making different software work together, getting the hang of how things should work (people sometimes get it wrong), getting everyone on the same page about what BIM should give us, clients being unsure about bringing in BIM, not having enough BIM skills, and really needing a tool that makes 3D building stuff.
Table 2: BIM Barriers for AEC industry
Sl. No |
Type of Barrier |
Authors |
The Barriers |
1 |
Personal Barrier |
(Bryde, et al., 2013 : Alhumayn, et al., 2017) |
Inadequate knowledge of what BIM is |
(Saleh,2015) |
Inadequate BIM understanding of current and developing technologies |
||
(Almutiri, 2016 : Gerges,M,et al., 2017) |
Cultural concerns that cause resistance to change |
||
(Banawi, 2017; Matarneh & Hamed,2017) |
Inadequate education and training |
||
2 |
Technical Barrier |
(Liu, et al., 2010) |
BIM file sizes are very huge. It is difficult to transport, manipulate, store, or share very big files. |
(Succar, et al., 2013) |
BIM is still used as a tool, for example, object-based modeling or model-based collaboration, whereas BIM users should strive for network-based integration. |
||
(Chan, 2014) |
Interoperability is inefficient. |
||
(Chan, 2014; Volk, et al., 2014) |
Information upgrading, difficult information update in BIM (time-consuming) |
||
(Chan, 2014; Biu et al., 2016) |
Inadequate infrastructure-based technology |
||
(Volk, et al., 2014; Matarneh & Hamed, 2017) |
There are no customized standards or explicit rules. |
||
(Saleh, 2015 : Gerges, M, et al., 2017) |
Current technology is sufficient
|
||
3 |
Organization Barrier |
(Bui, et al., 2016 : Gerges, M, et al., 2017) |
Scarcity of BIM experts |
(Arayici, et al., 2009 : construction, M.H, 2012) |
Cost of hardware upgrades and software purchases |
||
(Chien, et al., 2014 : Azhar, et al., 2015) |
Financial standing of the organization and difficulties in managing the BIM transition
|
||
(Jernigan, 2014; Omar, 2015) |
Change resistance/unwillingness to change |
||
(Memon, et al., 2014 : Volk, et al., 2014 : Gerges, M, et al., 2017) |
BIM necessitates significant changes in the organizational chart and work flow. |
||
(Saleh, 2015; Omar, 2015 |
There are no other competing initiatives. |
||
(Bui, et al., 2016 : Matarneh & Hamed, 2017) |
Lack of government assistance |
||
(Elhendawi, et al., 2019) |
Inability to transition from non-BIM to BIM users due to a lack of BIM experience |
||
4 |
Business Barrier |
(Azhar, 2011; Saleh, 2015) |
Return on Investment (ROI) Uncertainty |
(Construction, M.H, 2012; Omar, 2015) |
Most construction players choose a wait-and-see strategy because they haven't had enough time to analyse. |
||
(Construction, M.H, 2012; Saleh, 2015) |
Benefits are unclear. |
||
(Harrison & Thurnell, 2014; Banawi, 2017) |
Inadequate contractual arrangements |
||
(Gerges, et al., 2016) |
Training new users takes time and money. |
||
(Gerges, et al., 2016 : Gerges, M, et al., 2017 : Matarneh & Hamed, 2017) |
Cost implications for purchasing software licenses, hardware upgrades, training costs, and time at the start of BIM implementation |
||
(Alhumayn, et al., 2017 : Gerges, M, et al., 2017) |
The time-consuming and difficult modeling process |
||
(Elhendawi, et al., 2019) |
There is no mandatory government policy mandating BIM. |
||
5 |
Market Barrier |
(Porwal & Hewage, 2013; Banawi, 2017) |
According to the market, the incorrect understanding of BIM, as it tends to be introduced by software developers, is overdue in the beginning stage for switching to BIM. |
(Gerges, et al., 2016 : Gerges, M, et al., 2017) |
Inadequate client/government demand |
||
(Gerges, et al., 2016 : Matarneh & Hamed, 2017) |
Low adoption owing to a lack of BIM awareness |
||
(Banawi, 2017) |
Clients who do not adequately support the benefits of BIM |
||
6 |
BIM Process Barrier |
(Linderoth, 2010; Elmualim & Glider, 2014) |
BIM is not used by all participants. |
(Chien, et al., 2014 : Eadie et al., 2014 : Azhar, et al., 2015)
|
Legal and contractual issues (data ownership, traditional procurement methodology) |
||
(Saleh, 2015) |
Work procedures are changing (due to a lack of good coordination among project participants). |
||
(Saleh, 2015; Banawi, 2017) |
The risks and challenges of using a single model (BIM) |
||
(Banawi, 2017) |
Collaboration, integration, and interoperability are all essential. |
IV. PERCEIVED BENEFITS OF BIM
When people talk about BIM, they usually say it makes things work better. This idea of "BIM boosts productivity" is something a lot of people agree on. The differences in opinions come from people who haven't tried BIM yet, but they have big hopes. They believe that if everything goes right, BIM can do great things.
A. From the Client's Side
For them, BIM saves time, keeps projects on track, solves coordination problems, lifts quality standards, makes it easy to compare projects, gets clients involved early on, and cuts costs. Some also say that starting with BIM from the beginning of a project is super important. They know that trying to add BIM later can mess things up.
B. From the Contractor's Point of View
Contractors see BIM as a big help in getting everyone working together. It's like a team captain. BIM can save money, show clear project pictures for smart planning, and help with budget control using its tools. There's software that can find design problems before building starts, making things less messy. Also, with 4D BIM, tracking inventory gets easy, managing buildings becomes smooth, and making stuff gets faster.
C. From the Designer's Perspective
Designers really like how BIM makes their creative process better. It's like a treasure chest of ideas in a short time. BIM lets them quickly see changes, unlike the old ways with CAD. Plus, BIM is all about teamwork, less arguing, and fewer design mistakes. It's a quick way to exchange info and get accurate measurements.
V. DEALING WITH CHALLENGES AND FUTURE HOPES
The big roadblock in using BIM is the resistance to change – like trying to get everyone to switch to a new way of doing things. To tackle this, local businesses can team up with big global construction companies that know how to use BIM. It's like getting experts to show us the ropes. And the bosses at the top need to step up, understand how BIM can boost the whole company, make us better than the rest, and bring in more money. So, they need to be convinced to make the switch to BIM. To make things go faster, both the team and the top dogs should work together. Team members can start the change, but they need strong support from the top.
When it comes to getting projects rolling, Integrated Project Delivery (IPD) is the best approach to match with BIM. Governments should guide schools to teach BIM to students. This way, we'll have lots of people who know BIM and can join the workforce. Schools and BIM software makers should work together to show everyone how awesome BIM is through free training events.
Industry Foundation Classes (IFC) are like magic keys that open BIM files for use with different software. They stop problems when different software tries to work together. Sorting out who owns what in the models is also important, and clear rules should be in the contracts. The New Zealand handbook (2014) says designers and owners need to agree on using the model, and owners need designers' permission to use it too.
Right now, the construction folks are all about cutting waste and making things more efficient to boost quality and profits. BIM is like a treasure chest of info that gets everyone working better together, lowers financial risks, ramps up how well projects go, and helps figure out costs and how much stuff is needed. It\\\'s like magic that makes more money and stops arguments. But there are some problems stopping BIM from being amazing everywhere. Like not everyone knows about it in the AEC world, bosses aren\\\'t always on board, the government doesn\\\'t push it enough, people don\\\'t want to change how they work, there aren\\\'t many BIM experts, and changing to BIM takes time and money. To beat these problems, tech companies can step in. They can teach people who already work and those who want to learn at universities. Teaming up with governments and schools can help everyone learn about BIM. This way, the industry can get better and faster, and the AEC world will be superefficient and great at what they do.
[1] Abbasnejad, B. & Moud, H., 2013. BIM and basic challenges associated with its definitions, interpretations and expectations. International Journal of Engineering Research and Applications (IJERA), 3(2), pp. 287-29. [2] Ahmed., S., Dlask, P., Selim, O. & Elhendawi, A., 2018. BIM Performance Improvement Framework for Syrian. International Journal of BIM and Engineering Science, 1(1). [3] Alhumayn, s., Chinyio, E. & Ndekugri, I., 2017. The Barriers and Strategies of Implementing Bim in Saudi Arabia. WIT Transactions on The Built Environment, Volume 169, pp. 55-67 [4] Almutiri, Y., 2016. Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia, Manchester, England, UK: Doctoral dissertation, University of Salford. [5] Arayici, Y. et al., 2009. BIM implementation for an architectural practice. Managing It in Construction/Managing Construction for Tomorrow, pp. 689-696. [6] Azhar., S., 2011. Building Information Modeling (BIM): Trends, Benefits,Risks, And Challenges For The AEC Industry. Leadership and management in engineering, 3(11), pp. 241-252. [7] Azhar., S., Carlton, W., Olsen., D. & Ahmad., I., 2011. Building information modeling for sustainable design and LEED® rating analysis. Automation in construction, Volume 20(2), pp. 217-224. [8] Azhar, S., Khalfan, M. & Maqsood., T., 2015. Building information modelling (BIM): now and beyond. Construction Economics and Building, 4(12), pp. 15-28. [9] Baik, A., Yaagoubi, R. & Boehm, J., 2015. Integration of Jeddah historical BIM and 3D GIS for documentation and restoration of historical monument. International Archives of Photogrammetry, Remote Sensing and Spatial Information Sciences, 40(5), p. 2. [10] Banawi, A., 2017. Barriers to Implement Building Information Modeling (BIM) in Public Projects in Saudi Arabia. s. l., In International Conference on Applied Human Factors and Ergonomics (pp. 119-125). Springer, Cham. [11] Bryde, D., Broquetas, M. & Volm, J., 2013. The project benefits of building information modelling (BIM). International journal of project management, 7(31), pp. 971-980. [12] Bui, N., Merschbrock, C. & Munkvold, B., 2016. A review of Building Information Modelling for construction in developing countries. Procedia Engineering, Issue 164, pp. 487-494. [13] Chan, C., 2014. Barriers of implementing BIM in construction industry from the designers’ perspective: a Hong Kong experience. Journal of System and Management Sciences, 2(4), pp. 24-40. [14] Chien, K., Wu, Z. & Haung, S., 2014. Identifying and assessing critical risk factors for BIM projects: Empirical study. Automation in construction, Volume 45, pp. 1-15. [15] Construction, M.H, 2012. The business value of BIM in North America: multi-year trend analysis and user ratings (2007-2012), North America: McGraw-Hill Construction. [16] Construction, M.H, 2012. The business value of BIM in North America: multi-year trend analysis and user ratings (2007-2012)., s. l.: Smart Market Report. [17] Doumbouya, L., Gao, G. & Guan, C., 2016. Adoption of the Building Information Modeling (BIM) for construction project effectiveness: The review of BIM benefits. American Journal of Civil Engineering and Architecture, 3(4), pp. 74-79. [18] Eadie, R. et al., 2013. BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in Construction, Issue 36, pp. 145-151. [19] Eadie, R. et al., 2014. Building information modelling adoption: an analysis of the barriers to implementation. Journal of Engineering and Architecture, 2(1), pp. 77-101. [20] Eastman., C., Teicholz, P., Sacks., R. & Liston, K., 2011. BIM Handbook, a Guide to Building Information Modelling. 2nd ed. Hoboken: John Wiley & Sons, Inc… [21] Elbeltagi, E. & Dawood, M., 2011. integrated visualized time control system for repetitive construction projects. Automation in Construction, 7(20), pp. 940-953. [22] Elhendawi, A., Smith, A. & Elbeltagi, E., 2019. Methodology for BIM implementation in the Kingdom of Saudi Arabia. International Journal of BIM and Engineering Science, 2(1). [23] Elmualim, A. & Gilder, J., 2014. BIM: innovation in design management, influence and challenges of implementation. Architectural Engineering and design management, 10((3-4)), pp. 183-199. [24] Gerges, M, et al., 2017. An investigation into the implementation of Building Information Modeling in the Middle East. Journal of Information Technology in Construction (ITcon), 1(22), pp. 1-15. [25] Gerges, M., Ahiakwo, O., Jaeger, M. & Asaad, A., 2016. Building Information Modeling and Its Application in the State of Kuwait. World Academy of Science, Engineering and Technology, International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, 1(10), pp. 81-86. [26] Giang, D. & Pheng, L., 2011. Role of construction in economic development: Review of key concepts in the past 40 years. Habitat International. Habitat International, 1(35), pp. 118-125. [27] Harrison, C. & Thurnell, D., 2014. 5D BIM in a consulting quantity surveying environment. [28] Jernigan, F., 2014. Big BIM little BIM. 2nd ed. Maryland: 4Site Press publisher. [29] Karna, S., Junnonen, J. & Sorvala, V., 2009. Modelling structure of customer satisfaction with construction. Journal of facilities management, 7(2), pp. 111-127 [30] Khalil, R., 2017. Value Engineering for Public Construction Projects in Qatar, Edinburgh: MSc Dissertation Edinburgh Napier University. [31] Latiffi, A., Mohd, S., Kasim, N. & Fathi, M., 2013. Building information modeling (BIM) application in Malaysian construction industry. International Journal of Construction Engineering and Management, A (2), pp. 1-6. [32] Linderoth, H., 2010. Understanding adoption and use of BIM as the creation of actor networks. Automation in construction, 19(1), pp. 66-72. [33] Liu, R., Issa, R. & Olbina, S., 2010. Factors influencing the adoption of building information modeling in the AEC Industry,In Proceedings of the International Conference on Computing in Civil and Building Engineering. Nottingham, Nottingham University Press, pp. (139-145. [34] Love, P. et al., 2014. A benefits realization management building information modeling framework for asset owners. Automation in construction, Volume 37, pp. 1-10. [35] Matarneh, R. & Hamed, S., 2017. Barriers to the Adoption of Building Information Modeling in the Jordanian Building Industry. Open Journal of Civil Engineering, 3(7), p. 325. [36] McCartney, C., 2010. Factors affecting the uptake of building information modelling (BIM) in the Auckland architecture, engineering & construction (AEC) industry, New Zealand.: s.n. [37] McGraw-Hill, 2009. The business value of BIM: Getting Building Information Modeling in to Bottom Line, New York: Smart Market Report. New York: McGraw-Hill… [38] McGraw-Hill, 2012. The business value of BIM in North America: multi-year trend analysis and user ratings (2007-2012), New York: McGraw-Hill.: Smart Market Report. [39] Memon, A., Rahman, I., Memon, I. & Azman, N., 2014. BIM in Malaysian construction industry: Status, advantages, barriers and strategies to enhance the implementation level. Research Journal of Applied Sciences, Engineering and Technology, 5(8), pp. 606-614. [40] Moreno, C., Olbina, S. & Issa, R., 2013. School of building construction, USA.: university of Florida. [41] National Building Specification, 2014. NBS National BIM Report, UK: NBS. [42] Omar, H., 2015. Solutions for the UAE Architecture, Engineering, and Construction (AEC) industry to mandate Building Information Modeling (BIM), Dubai: (Doctoral dissertation, The British University in Dubai (BUiD)). [43] Omar, H. & Dulaimi, M., 2015. Creating a sustainable future: Solutions for the construction waste in the Greater Cairo. Abu Dhabi, the first international conference of the CIB MENA research network, Smart, sustainable and healthy cities. Abu Dhabi University. 14-16 December 2014, pp. 281-305. [44] Panuwatwanich, K. et al., 2013. Integrating building information modelling (BIM) into Engineering education: an exploratory study of industry perceptions using social network data… [45] Porwal, A. & Hewage, K., 2013. Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction, Volume 31, pp. 204-214. [46] Sabol, L., 2008. Building information modeling & facility management. Dallas, Texas, USA.: IFMA World Workplace. [47] Saleh, M., 2015. Barriers and Driving Factors for Implementing Building Information Modelling (BIM) in Libya, Libya: (Master\\\'s thesis, Eastern Mediterranean University (EMU)-Do?u Akdeniz Üniversitesi (DAÜ). [48] Salla, F., 2014. 15 advantages of using BIM. [Online] Available at: http://blog.visualarq.com/2014/03/12/15-advantages-of-using-bim/ [Accessed 14 December 2017]. [49] Samuelson, O. & Björk, B., 2013. Adoption processes for EDM, EDI and BIM technologies in the construction industry. Journal of Civil Engineering and Management, 19(1), pp. S172-S187... [50] Shaban, M. & Elhendawi, A., 2018. Building Information Modeling in Syria: Obstacles and Requirements for Implementation. International Journal of BIM and Engineering Science, 1(1). [51] Succar, B., Sher, W. & Williams, A., 2013. An integrated approach to BIM competency assessment, acquisition and application. Automation in construction, Volume 35, pp. pp.174-189. [52] Volk, R., Stengel, J. & Schultmann, F., 2014. Building Information Modeling (BIM) for existing buildings—Literature review and future needs. Automation in construction, Volume 38, pp. 109-127… [53] Wang, J., Wang, X., Shou, W. & Bo Xu, 2014. Integrating BIM and augmented reality for interactive architectural visualisation. Construction Innovation, 14(4), pp. 453-476.
Copyright © 2023 Abdul Althaf Mahammad. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Paper Id : IJRASET56202
Publish Date : 2023-10-18
ISSN : 2321-9653
Publisher Name : IJRASET
DOI Link : Click Here